Match BOM Production Entry Line Sequence to BOM Maintenance detail line entry

SUGGESTED

We are on Sage 100c 2019 and I'm trying to find out a way, that when BOM Production Entry is launched and we go to the lines tab, that the line sequence is NOT alphabetical/numeric ascending (which appears to be the default), but based on the way the Bill was entered in BOM Maintenance.  Or how I have used the Find No. field to label the desired sequence.  Or by a UDF that I entered in BOM Detail table that mimics the same Find No. field, but it never shows up under the Production Entry Detail table via Custom Office; only header info. is available.

Is there a way, either by UDF linkages or scripting, that will show the line sequence that is setup in BOM Maintenance when we go into Production Entry? 

This seems to be a huge oversight by Sage.  When making anything, you have to follow a defined sequence of events, which needs to be inputted in a specific sequence and then printed in a specific sequential order.