Hi,
I have checked the term setup in A/R Setup -> Term. Is there any way to set the term to be based on working days? (E.g 30 working days instead of 30 calendar days?)
Thank you.
Hi,
I have checked the term setup in A/R Setup -> Term. Is there any way to set the term to be based on working days? (E.g 30 working days instead of 30 calendar days?)
Thank you.
No.
Could be done using Orchid Extender if it was a must-have.
No.
Could be done using Orchid Extender if it was a must-have.