  • Alter Pivot export in SEI fails

    Hi, When exporting a SEI report with "altered pivot", the "altered" mode fails. This is the case for excel and pdf export formats. When viewed in SEI it look perfect. Exported files reverse the "altered" mode. See example in image. Does anyone know how…
  • SEI @@curdate use into formula.

    Hi everyone, I'm trying to have a SEI view that shows me a week's window of information in a way that the date is variable and not fixed using an specific date in the filter formula. I've tried to use the @@curdate variable is seems is not compatible…
  • Work Center Replacement and Routings

    Do I need to create an alternate routing for every type of work center replacement configuration ? for example: if my routing alt 1 calls for work center A and I set a replacement for work center A to be work center Z and run the optimization function…
  • Work center resources

    If my work center is set up as a machine, is the # of resources the: # of machines or the number of people to run the machine ?
  • Work Center Grouping checkbox

    Is this feature used to group work centers together (as if they were connected with a conveyor system) so that the scheduling tool doesn't replace one work center with another, and also keeps the schedule together (split the work order across a couple…