bill of material global change possible?

SOLVED

We have changed the raw material item, which gets used in hundreds of BOMs.  Is it possible to do a global change, or do you have to go into each BOM and change it?

Parents Reply
  • 0 in reply to BigLouie

    I changed it in item maintenance.  We're a manufacturer, and we use different widths of slit coil to make our parts.  One specific slit width and make hundreds of different parts, each consuming a different weight of material.  I needed to change the main item, which I did.  Now I'm hoping I won't have to open each BOM and manually change it.  

Children