Changing Multiple Bill of Materials items at once / Sage100 ERP

I have about 200 items from which I need to remove one component item and replace it with another.

Is there a way in which I can do this without having to go into BOM Maintenance for each of the 200 items and doing it manually?

I know I can add the additional material via Visual Integrator, but how can I remove the existing one? Or, is there an easier way?

I am on Sage100 ERP 2014 Advanced (V. 5.10.3.0)

Thank you in advance.

Parents
  • Bill of Materials, Change Control, Remove,Delete, Replace Entry.  With VI you can only add lines, you cannot remove lines in any data entry module.

  • in reply to BigLouie

    Thank you for the prompt reply, Big Louie.

    I do not have a "Remove, Delete, Replace Entry" item in BOM/Change Control. I do have one called "Replace and Delete Component Entry" but it seems to be an all-or-nothing. I need to change 200 items out of about 500 which use the material, not every item which uses the material.

    Sorry I didn't make this clear on the original post.

Reply
  • in reply to BigLouie

    Thank you for the prompt reply, Big Louie.

    I do not have a "Remove, Delete, Replace Entry" item in BOM/Change Control. I do have one called "Replace and Delete Component Entry" but it seems to be an all-or-nothing. I need to change 200 items out of about 500 which use the material, not every item which uses the material.

    Sorry I didn't make this clear on the original post.

Children