Does Visual Integrator -> Sage Timesheet

We are using a cloud based project management system.  All employee time is entered into this system.  However, Sage Timesheet (9.85) is used to feed our billing, which is currently done through MAS 200 (4.40).  I can grab the time entries from the project management system and format it any way that is needed.  Now I'm looking for the easiest way to get it into Timesheet.  I've looked at using ODBC, but the ODBC drivers that I'm able to find are read-only.

Would Visual Integrator allow me to read information from a file and load it into Timesheet?  Are there other integration strategies that might work equally well?  Ideally, this would be a process that could run automatically at night.

Thanks in advance.


Mark