how many hours are involved in upgrading from sage 100 2017 to sage 2022? we have a pretty basic set up with maybe 3 custom reports, installed on 6 computers and 1 ob connection.
I have done two (2) upgrades recently and did both on a Saturday, about six (6) hours. Not hard at all. There are always little glitches that delay things or pop up the next day.
I have done two (2) upgrades recently and did both on a Saturday, about six (6) hours. Not hard at all. There are always little glitches that delay things or pop up the next day.
I'm guessing that is just the upgrade day processing time... not including preparation work / system analysis / planning.
They were basic systems with no enhancements. Long time users. They handled the work station setup as I did the install and data conversion. We flew through it. But as you know, there is always something.
We have a long checklist for each upgrade, with a couple hours of things to go through (building the project scope) before putting hands on keyboard to start the work.
Knowing the customer system in advance would simplify things for sure.