Hi,
I have checked the term setup in A/R Setup -> Term. Is there any way to set the term to be based on working days? (E.g 30 working days instead of 30 calendar days?)
Thank you.
Hi,
I have checked the term setup in A/R Setup -> Term. Is there any way to set the term to be based on working days? (E.g 30 working days instead of 30 calendar days?)
Thank you.
*Community Hub is the new name for Sage City