Good morning,
I am trying to incorporate the WBS structure into the setup of the PJC module but can not find a way to do so.
Any suggestions will be appreciated. Thanks and happy holidays!
Because we are already using the contract and project codes for actual information tracking
Because we are already using the contract and project codes for actual information tracking
Huh?
I need to accommodate a structure like this:
11 project management and control
111 project directing
112 organization and staffing
1131 project basic planning
11311 general project basic plan
11312 administrative basic plan
11313 engineering basic plan
I hope this helps
We have a module - Projects for Sage 300 - that is based around the concept of a work breakdown structure versus fixed Contract\Project\Category structure in PJC. This link is to a Sage webinar that presents the product.
https://www.youtube.com/watch?v=h08R4jSYq5o
Hi Andrew. Is it possible to get in touch with you?
Hi Terry,
You can email me - [email protected]