I did the following
- At the contract level I set the Overhead type to Percentage of cost on a job
- set the % to 26.74
- entered and posted a cost and eq transaction
** I anticipated seeing my cost + 26.74% in my GL batch. I only see my cost
I thought it might be that I had to set it at the project level and that the setting at the contract level is only a default like other settings but I can't find anything to set at the project level.
What could be wrong as to why the Job OH isn't calc at all. Labour OH works fine.