We are beginning a project that will have multiple phases over multiple years. We will be fabricating spools and receiving material that will end up on this project at some point. The fabrication will be done at multiple sites and shipped to the project. What is the best way to track this? I'm assuming I would set up a Phase for each Phase of the project and then cost codes for each location / type of material. For example Phase 1 - Cost Code 5100.01 - Poly Pro Pipe - AZ, Cost Code 5100.02 - Poly Pro Pipe - TX. Setting the project up this way may create an infinite cost code list. Anyone have a better idea?