Hello,
We are currently set up with period end dates equal to the end of the month (ex January 31) however we have made a decision to implement a 4/4/5 week schedule as that aligns better with our operations. Is there any way to change and pick the period end dates within Sage? Or are we locked into the end of the month as the period end date?