I am wondering if there is a way to tell when a job was created in JC?  We have a large list of jobs, and with no other qualifing data, I am trying to find out when certain jobs were created in the system.  This will help determine if I need to offically close it down or leave it open.

(Sage 300 CRE, 18.4.1)

Parents
  • 0

    If you pull up the job in Job Set  Up and select "Status".  System tracks Start and completion date, the last cost update date.  You can also ask your accoutant/ Controller to let you know which projects have been closed out on the books per the WIP schedule.  Hope this helps.

  • +1 in reply to AnaC
    verified answer

    Thanks for the reply and the notes.  I am the accountant/controller.  :-)  We are unsure if these are very old jobs needing to be closed (zero transactions) or very new jobs (with zero transactions).   A job setup date would help solve that issue.

Reply
  • +1 in reply to AnaC
    verified answer

    Thanks for the reply and the notes.  I am the accountant/controller.  :-)  We are unsure if these are very old jobs needing to be closed (zero transactions) or very new jobs (with zero transactions).   A job setup date would help solve that issue.

Children
  • 0 in reply to RCousino

    Interesting. I'm not giving up yet. Have you checked the Date Stamp on the Job table? It should show the last date the Job was modified.

  • 0 in reply to kathym@alliance

    When you say "the date stamp" field, I am not sure what you are referring to.  The start and completion date fields that AnaC mentioned above are manually edited fields by users.  In my case, nothing as been manually entered.  I am looking for a system recorded field that tells me when the job was created.  (as you said below, that doesnt exsist.  

    I also have ODBC connection to the JCM_Master_Job table and I am not seeing any data fields with populated data that resemble a "Date Modified".  Perhaps I am just overlooking it, but maybe not if it just doesnt exsist.

  • 0 in reply to RCousino

    Sorry for not being clearer - I think I mentioned in my earlier post that the Date Stamp field is automoatically assigned by the system. This applies to transations as well as master files, such as the Job. Every time an update is made to the Job or an entry is posted to it, the date stamp is updated to the actual date of the change. It's not using the Transaction Date or Accounting Date, it's the date on your server.

  • 0 in reply to RCousino

    do these jobs have estimates?  if so you can see when the estimates were entered by going job cost, transactions, cost/estimate transactions.  go to the job number and you will see the estimate and date of estimate.