Change Job Cost Code Status in Bulk for Closed Jobs

SUGGESTED

We are working on implementing a Time Tracking software that looks at the individual Job Cost Code Status for choosing what codes/descriptions to synchronize.  Sage does not change individual cost code status to Complete when the Job Status is changed to Complete.  My question is if there is a way to change ALL cost codes for ALL closed/complete jobs to Complete without going into every job cost code to change the radio button?  Right now Closed/Complete Jobs still have their individual cost codes "In Progress", so we have cost codes from OLD jobs that will show up in our Time Tracking cost code list.  The Time Tracking software can filter the cost codes once imported, but I would prefer to not even have the old cost codes hit that system.  I have searched the knowledgebase and only find how to change the status individually.