It looks like this question has been asked before, but I am not finding a current answer to my question. Is there an API to connect to Sage 300 CRE Job Cost files?
Hi
We've been using EQ modulo, to allocate Equipment to Jobs. We use Revenue in EQ, hours of usage are imported to Sage as csv file (comes from third party software). All EQ cost is allocated to jobs and shows properly in all Job Cost Reports.
We…
We use AL Mobile for timesheet entry. When jobs and cost codes are entered in Job Cost, they are imported into AL Mobile at regular times during the day. If they are set to unstarted, they aren't imported; I manually change the status to "in progress…
Looking for a report or inquiry that provides the detail data below. Any suggestions?
Job #
CO #
Cost Code
Category
Units
Price Total Price
Cost
Total Cost
We are working on implementing a Time Tracking software that looks at the individual Job Cost Code Status for choosing what codes/descriptions to synchronize. Sage does not change individual cost code status to Complete when the Job Status is changed…
I have 3 users that are creating change orders in Sage Construction Management (all on the same project) and when they are passed along to Sage Job Cost the change order total is somehow doubling. This only affects positive change orders. Is there something…
When you run a Job Cost Report and some of the Cost Codes show no details and the JTD Cost column is 0.00 but the Remaining column has say $15,000.00. This tells me there are entries for that Cost Code (say Hvac - Rough in 10-18-010) but the report shows…
We are trying to get lines of labor into our T&M cost based billing jobs. We enter the labor through the JC Direct Costs table using category (L). The transaction date is the date worked, the accounting date being end of the work month. We are trying…
We currently process payroll in house but are considering outsourcing. We are looking at Miter, Proliant and Paychex. Does anyone have any experience with these vendors or any others in regards to the payroll posting journals? Specifically making sure…
Hello,
I pulled an Over/Under and realized that on a specific job the JTD costs are not showing. We were billed and already paid the intercompany for their portion of the project (through TimberScan), but JTD costs isn't reflecting this. I already confirmed…
Upon job set-up, the original contract value was accidently entered in the misc worksheet instead. We attempted to 0 it out, but this just caused a negative transaction on the misc worksheet. Is there a way to remove the misc worksheet entries for a job…
Trying to get import time from a text file and we are getting this error. We aren't sure what needs to be changed. We were told we needed to have "DC" in the first column without a header. We have tried deleting and leaving blank and keeping it. Not sure…
I have been searching everywhere to find an inquiry that has the last billing date for a contract. Does anyone know if such a thing exists? I can't even find where this information is stored in contracts, billing, job cost, AR, anywhere. Your help is…
1. I m looking to see if there is a report that would show me if i have billed retaiange.
2. I m looking for a report or something that i can run that would show if I billed for my jobs that month.
Hello,
We have a division project that caters to small projects. We are thinking if it's possible on the job cost to have Extras for the cost code. Is anyone knows or did that before? Your suggestions will be highly appreciated! Thanks!
We are in need of a report that can show unit cost based on labor cost. Is there a report that exist where we can enter quantities weekly so we can analyze labor cost vs unit production?
We used a Job Cost Direct Costs Journal entry to post a wire fee to one of our jobs. The fee correctly posted to the GL, but when we attempt to complete our monthly bank rec, the wire fee is not showing. How do we ensure the wire fee is recorded in Cash…
Hello Sage CRE Forum!
We are in the process of integrating our Sage 300 CRE to our new Project Management software Build Cost Management by Autodesk.
Has anyone here done this yet? I expected some issues along the way but I would like to know what…
Is there a report within Sage by cost code that is not split by job? Lookng to anlayze which cost codes are utilized more than others over all project ranges.