JC report run based on jobs with labor cost for a specific PE date

SOLVED

I would like to be able to send (thru MA)  a labor cost report (JC) to PM's for only jobs that had payroll the previous week.  I have the report built, but all jobs with Labor cost run - is there anyway to condition/filter by only jobs with PR for a certain Period End Date?