Sorry, but there are no more tags available to filter with.
  • T&M User Setup as Contractor, not Employee

    Can T&M users be configured as contractors (not employees)? I want them posting hours directly to projects so project budgets stay up to date. They can send a single merged bill at the end of each month which can be reconciled against the project hours…
  • Allowance Packages

    What's the best way to handle allowance packages in Sage Construction Manageme nt? Our situation: Our prime contract includes (2) cost codes set aside for allowances—one called "Utility Connection Allowance" for $3,000 and another called "Contingency…
  • mass editing classifications in company database

    I am setting up our company contact database in SCM. Are there any tips for mass-editing the classifications for each company? I have used the Assign Classification function in the Action menu, but I have to sort through the entire 1500 company database…
  • Time Out Settings

    I have tried extending my timeout to 8 or 9 hours and it keeps defaulting back to 1 hr. Is there something I am missing? I go to Settings > Company Settings > Users , choose my profile, change the default and close. I then log out and log back in, but…