• Data base item change date

    A general and important question When you insert a item into the estimate from the database the change date is the current date. What I want to know can a column for the data base change date be visible in the estimate file. This would make it easier…
  • Unlinking Items

    I have 14 material items that are linked together. Is there a way to unlink all items in this group that does not require editing each one?
  • "Updating Job Cost Phase" Database From Estimate

    I have updated few "JC phase" items in the estimate and then tried to update these item in "DATA Base" with utilizing " I have gone through all steps from inserting "Update DB" col and check make the items and also followed all steps after. …