• Data base item change date

    A general and important question When you insert a item into the estimate from the database the change date is the current date. What I want to know can a column for the data base change date be visible in the estimate file. This would make it easier…
  • Can a SQL standard database be converted from 3 digit to 2 digit suffix?

    We have a legacy standard database that is set as a 3 digit phase code suffix, example 03000.000. We would like to convert it to a 2 digit suffix, example: 030000.00. I tried to merge a 2 digit and 3 digit but the merge routine rejected the operation;…
  • "Updating Job Cost Phase" Database From Estimate

    I have updated few "JC phase" items in the estimate and then tried to update these item in "DATA Base" with utilizing " I have gone through all steps from inserting "Update DB" col and check make the items and also followed all steps after. …