History:
1: Original request created and PO was generated for all goods on 1 line (eg 200.00)
2: PO received using 1 line: (eg: 200.00)
3: PO modified (2 lines added) and changed from 1 line to 12 (eg: 300)
A: the last 2 Lines that were added were already received on another PO:
Issue:
1: Rec:G is now referencing the PO but is no longer receiving any lines, (PO has 0 lines received)
Was wondering if there was a way to reapply this Rec:G to the PO, delete those 2 bogus lines and prepare for invoicing and payment.