Material Costs in reference to routings

SOLVED

I am stumped and need to find some answers, hopefully someone here can help?

On the routings, each material item has an associated "Material Cost", I am trying to determine where is cost is coming from. It doesn't matter to me if the material part if purchased or manufactured. What I am seeing in our system is a lot of inconsistency. For purchasing items, I have looked at the purchase orders/invoicing, but that doesn't match up (we do use 'average', but even then it's not close.) On manufacturing items, I looked at the Work Orders completed and tried to get the cost from there, but again, nothing is coming close. I've looked at "Inventory Transaction Distribution" and still not finding what I need.

Does anyone know how the "Material Cost" gets updated? (we are on SAGE MAS 500 2013). Thanks for any input/ideas!

Parents
  • 0

    Alford - can you be more specific about what cost you are looking at?  What report, explorer or screen are you reviewing the cost on?

    There are a lot of places you could be looking at and many of these have different sources.  Routings generally pull the standard cost for purchased items.  Work Orders will generally pull the cost based on the valuation method of the item and the current status of the cost tiers at the time the transaction is processed.  For a Routing, if the item is a sub-assembly and you reference the sub-assembly routing on the higher level routing the system will explode the sub-assembly routing to capture the costs.

    The best report to review costs for a Routing is the Bill of Material Report - but only after you ensure that the routing has been updated with current costs.  This happens by either saving the routing or running the BOM Regen.

  • 0 in reply to RussG

    Hi Russ,

    I am using the explore view for Bill of Materials. Trying to verify the values in the 'Mat Cost' field.(tmfBillOfMat_HAI.BoMtMatCostStd). I'd like to know how Sage is updating this value. 

    When we manufacture an item in house (example: total cost is $4.60)

    When that same item is added to a Work Order as a material item (Routing shows as sub assembly, steps blown out as you described above). but the Material cost on the Work order is more than double @ $9.44 for that component. To me, this doesn't make any sense. There is not other labor/material/other costs listed.

    I've been here at this company for about 1 1/2years, as far as I know they have never done a 'Cost roll-up' or BOM Regen. Could this be the issue?

Reply
  • 0 in reply to RussG

    Hi Russ,

    I am using the explore view for Bill of Materials. Trying to verify the values in the 'Mat Cost' field.(tmfBillOfMat_HAI.BoMtMatCostStd). I'd like to know how Sage is updating this value. 

    When we manufacture an item in house (example: total cost is $4.60)

    When that same item is added to a Work Order as a material item (Routing shows as sub assembly, steps blown out as you described above). but the Material cost on the Work order is more than double @ $9.44 for that component. To me, this doesn't make any sense. There is not other labor/material/other costs listed.

    I've been here at this company for about 1 1/2years, as far as I know they have never done a 'Cost roll-up' or BOM Regen. Could this be the issue?

Children