HH2 integration and Vacation/sick accruals

SUGGESTED

Does anyone use HH2 as well as accrue vacation/sick time in SAGE 300? I am concerned that since the accrual is based on a YTD unit that it will cause employees to look back at old stubs and still see their current vacation/sick accrual. We have been using HH2 and now want to start keeping track of the accruals in SAGE rather than manual, however I dont want to get into a situation where an employee claims they have more time than they actually do based on an old stub being pulled from the HH2 system.

  • 0
    SUGGESTED

    We use HH2 paystubs.  Until recently, I was keeping track of vacation manually.  The accrual wasn't listed on the pay stub in HH2.  I worked with someone at Sage to get our accrual setup in Sage and also had to work with someone from HH2 so that the stubs would reflect the accrual information.  If you have Sage support I suggest you contact them to set up an appointment so they can walk you through the accrual setup.  After that HH2 will have to adjust some settings behind the scenes.