Estimating reports into Power BI

Hello,

I’m new to Sage and looking to access estimates through Power BI.  I’ve connected through ODBC, but I do not see how to get estimate information, only Database information.

any ideas?

Parents
  • 0

    You can point Power BI to the Timberline Data Source to connect into Sage 300 CRE data. I believe there is an article about the Timberline Data Source if you search the KB for info on how to get that configured.

    From there I would start with the JCM or PJ tables to begin finding data relevant to estimates.

Reply
  • 0

    You can point Power BI to the Timberline Data Source to connect into Sage 300 CRE data. I believe there is an article about the Timberline Data Source if you search the KB for info on how to get that configured.

    From there I would start with the JCM or PJ tables to begin finding data relevant to estimates.

Children