How do you use Extras? I know how to set one up but I am wondering what they are typically used for. We use Change Orders but not Extras. We sometimes have PO's that are on the same job but are not related to the contract and we were hoping we could use Extras to track the costs/revenue.

Parents Reply Children
  • in reply to Kprinse

    Wondering if you've ever received a more indepth response to your questions. I'm looking at using Extras for the first time, and don't know if I need to set up the "sub-jobs" with a different (and separate job number) or if it can just be given an identifier (say by address or school name) as the ID. Our main job is for a school district, and there will be several schools where we're performing work for which we'll need to track costs separately from our GC's. We're hoping to use Extras to accomplish this, but we have no experience with this feature in Sage.

    I attempted to do a Sage Live Chat last week to get some questions answered, but I didn't get exactly what I was looking for.

  • in reply to Kprinse

    I believe they can be billed to separate contracts but not one to quick bill and one to contracts because that is set on the main job level. 

  • in reply to Angela Gonnerman

    We used Extras with a school district where we built 64 playgrounds at 64 elementary schools. So, the main job followed our naming convention of YY-XXXX-00, and then each extra was named with the name of the elementary school where the playground would be built. Ex. Woodridge Park Elementary The main job had all of the overhead costs on it if they truly couldn't be billed to an individual playground.

    Each extra had the same cost codes and could be run separately to see how the playgrounds were doing individually. The main job could run to show how the whole job was doing at any given time.