I want to add some addons that are based on the project duration that I enter in Estimate info.
I have entered the duration on the Estimate info as " 3 weeks"
I have set up an addon with a cost basis of "Project Info"
The source is the Estimate
Selection is "Duration"
And the rate is $100
This should technically calculate $100/week of the project.
The add on does not work....
Help