estimating, job cost, & contract modules

does anyone use estimating, job cost, and the contract modules (all 3)?

I have questions on how to transfer data between them.

Parents Reply
  • 0 in reply to Cmccourt

    No cost codes or anything other than the estimate number and the project name is transferred.

    Yes,  we use project management,  track job status, etc.

    Our problem is that currently we have to enter (re-type) an entire contract line by line into job cost. Is there is a way to transfer all that data from the estimate automatically.

Children
  • 0 in reply to the todd group

    Yeah, that is exactly what happened to us too. We got rid of Project Management. Our data was very all over the place. 

    We stopped using it and things have gotten alot cleaner. 

    However, so you are aware, when you use PJ, you are going to want to run your reports and inquires out of PJ. That is the only way I was able to get some visibility when we had issues.