Requirement parameters

SOLVED

In requirements parameters, replanning rules, if I set the type WOF to simulation, I don't get any WOS's. When I set the method to Messages only, I get WOS's but the message is to Cancel. Also it seems to be planning for way too much expected stock. I would think ti would try to land on the safety stock from the product-site record.

We have the TPF type in simulation method and those suggestions look great. What are we doing wrong? Version 11 here.