Internal constraints don't allow us to have a WOF of more than 5,000. If we have a SOF for 15,000 and 3 WOF's for 5,000 each, replanning wants us to increase the first WOF to 15,000 and cancel the other two WOF's in the same time bucket. Is there a way to get it to recognize the three WOF's = the one SOF?

Parents Reply
  • 0 in reply to John Mitchell

    MRP is analyzing the buckets for the supply and demand.  If the WOs are spread across multiple buckets, MRP isn't going to take it into account (though maybe the "coverage" feature is used, but I'd have to test that out).

    The buckets are defined here in the MRP settings.  So here, in this example, if the WOs are in different weeks, it will only be seeing the demand and supply per week and then calculating the requirements for that week.