X3 Manufacturing - 2020R4 - Critical bug : Work Centre modification

The records in the table CAPVAR (Capacity Variations) and RPLWST (Replacement work centres) are lost when modifying the work centre in function Work Centre (GESMWS).

This critical issue has been fixed in 2021R1 and can be solved in 2020R4 by installing the Hotfix  WX_229040_R090_024.zip (X3-229040)

You can download the hotfix on our ftp server.