Assignments in X3 - linking a WO to a PO for a report

SOLVED

I am on v6.5 and trying to write a simple Crystal report linking a WO and its required components that are on a PO.  My issue is I cannot find the "link" between the WO and the PO.  I have used the assignments workbench to link and to force allocate the PO to the WO.  I have studied the ORDERS table. My PO is there and my WO is there. BUT I cannot find a link between the two (as the WIPNUM is different).  X3 must be writing something to a table somewhere as the assignment workbench screen shows the link between the two on the screen.  Thanks for your help.

Parents Reply
  • 0 in reply to Jeremy Rosenbaum

    I am using the MTOLINK TABLE when importing the assignments but I am having an issue where the quantities available are not decreasing when assigned but duplicating.

    Ex:- If I have 100 pieces when the PO is linked to the SO, it should show 0 available, and this is working when it's done manually. However, when I use the import template instead of seeing 0, I still see 100 pieces available. When I check on the ORDERS table, MTOQTY is 0.

Children