How to set up Requirements parameters for multiple BOM

SOLVED

Hello Guys,

We're implementing MRP function for one our company and we've some Semi-finish product which has multiple BOMs for the same item code and in the same Site, please can anyone advise on how to set up multiple Requirements parameters for items and Site with multiple BOMs.

Sage X3 version: V11

Parents
  • 0

    Not sure I understand. Do you mean multiple semi-finished products for the same parent that have different BOM codes? I know that the storage site and requirement parameter BOM code are a one to one match. Sage wanted to do something with the planning site vs production site on work orders but that never came to fruition. Would be a boon for us if one could call out the planning site parameters regardless of the BOM code. Maybe some day...

  • 0 in reply to John Mitchell

    Hi John,

    Thanks for your advise. We've some semi-finish product which has multiple BOMs and each BOM is assigned to a different BOM code and since Requirements parameter setup is one to one( 1 Storage Site to 1 BOM Code), how can we do the setup for multiple BOM code using the same Storage Site. 

    Please see the below screenshot.

Reply
  • 0 in reply to John Mitchell

    Hi John,

    Thanks for your advise. We've some semi-finish product which has multiple BOMs and each BOM is assigned to a different BOM code and since Requirements parameter setup is one to one( 1 Storage Site to 1 BOM Code), how can we do the setup for multiple BOM code using the same Storage Site. 

    Please see the below screenshot.