Split work order based on maximum batch size

SOLVED

We can only make our FG products in batches of 60 each. So if the demand is for 120 then we need 2 work orders for 60 each. How can we get MRP to split the demand of 120 into 2 WOs of 60 each? Currently it suggests 1 WO for 120.

Thanks,

Matt

Parents
  • 0

    You can set the technical lot to 60 on the product-site record for the item(s), and then set up a reorder policy (Common data, Product tables, Reorder policies [GESTRP]) with splitting set to either successive or parallel, depending on how you want your two work orders scheduled. Successive will suggest work orders scheduled one after the other; parallel will suggest them scheduled at the same time. Assign the new reorder policy to the item(s) on the product-site record.

Reply
  • 0

    You can set the technical lot to 60 on the product-site record for the item(s), and then set up a reorder policy (Common data, Product tables, Reorder policies [GESTRP]) with splitting set to either successive or parallel, depending on how you want your two work orders scheduled. Successive will suggest work orders scheduled one after the other; parallel will suggest them scheduled at the same time. Assign the new reorder policy to the item(s) on the product-site record.

Children