Can production tracking be reversed?

SUGGESTED

Hi,

I am having issues when it comes to Production Tracking and WO Closing. Here are the issues:

1. One of the materials in my BOM was discontinued but production already tracked all materials. Since it is discontinued, there was no stock of that material; therefore, is shows "Pending" under the components tab when closing. I manually tracked the right material and hoping to get it closed, it does not let me. Sage pops up an error saying "one or more materials have not been consumed". How do I proceed with this issue? 

- Can I reverse the tracking? How do deselect that material from being consumed in the WO closure site? I tried to "Do not track" the material in the Production Tracking site but did not do anything. I am assuming it was because it was already tracked, but with 0 in stock?

2. Why does Sage let me track Production, Operation, and Components when one of the components is short or out of stock? Shouldn't it stop me from tracking when one or more components are short? That basically mean I did not make the products I said I did.

Would appreciate the help. Thanks is advance.