hello i need your help 

when i produced a product another semi finish product produced like in the example:

 Raw Material: Sheet of steel, 100 cm x 100 cm

Semi Finished Product 1: Metal bracket

  • Amount of raw material needed: 50 cm x 50 cm

Semi Finished Product 2: Metal plate

  • Amount of raw material needed: 25 cm x 25 cm

    if i idnetfy the 2nd semi finished by product it will not costed if i make it normal product the system will divded the cost over 2 product as they have the same size 

    please anyone could help me ?
  • 0
    SUGGESTED

    Hi 

    This is working as designed.

    • If the 2nd Semi-Finished is set as a Byproduct, then the system expect you to provide the unit cost. The actual cost calculation will only apply on the released product(s).
      This is a product limit which is a real pain when addressing any industry with a cutting process. Custom development can be made to work around this limit but it is often quite expensive.
    • If you set both semi-finished products are released products (multi-products WO), then the cost would be defined based on the quantity produced. So if you managed your products in unit (Stock unit = UN), then the cost will be the same for each unit produced. If you managed your products in Kilo or square meter (Stock unit = KG or M2), then the quantity produced will be different for each format and the cost per product will be more accurate. However, you would need then to use packing unit to identify the actual number of units you have in stock.
      The downside of this solution, is the creation of multi-products work orders is manual only. again, you would need some customization budget to automate the creation of a multi-products WOs from the MRP.