Hi,
I need to add overhead costs to the finished product however unsure how to configure. In this case the overhead is based off of quantity and a $ value. Meaning the rate is 2.56/kg so for 550 kg made the total overhead would be $1408. Hoping someone can assist.
thanks
Christine