Overhead costs

SOLVED

Hi,

I need to add overhead costs to the finished product however unsure how to configure.  In this case the overhead is based off of quantity and a $ value.  Meaning the rate is 2.56/kg so for 550 kg made the total overhead would be $1408.   Hoping someone can assist.

thanks

Christine

Top Replies

  • Hi  

    You need to set the overhead code this way:

    256 is a formula set this way:

    I recommand to set the formula on all formula column A, B, C and D for you are sure this formula will be used…