Looking for any words of wisdom or experience in driving MPS from a different BOM, than MRP. All on the same site in the Requirements Parameters Settings.
Goals:
Allow Purchasing to have a ‘pure’ BOM from which to purchase from (BOM 1)
Allow Production to have a Manufacturing BOM based on on-hand materials or imminent arrival materials (BOM 2-??)
Scenario:
Manufacturing will not have materials for the 'pure' BOM, so we need to deviate for a period of time. However, we do not wish Purchasing to be driven for this alternate BOM.
Investigation:
MRP to keep BOM 1 as the purchasing ‘pure’ BOM
MPS to utilize BOM 2 which will be updated to on-hand materials or imminent arrival materials.
What financial implications (costing, forecasting, etc)
Other Implications