I received the following error when signing into Sage this morning. Our partners, RKL eSolutions, sent us the instructions to fix the problem, and I thought others might benefit from this information.
Warning: the logical connection date is not the same as the date required for the connection. ENDDAT parameter is not authorized for connections with a logical date greater than 12/31/13.
Full credit goes to RKL eSolutions and Sage for the solution. Thanks.
DESCRIPTION "Warning: the logical connection date is not the same as the date required for the connection |
This warning occurs when the Folder ENDDAT is set to a date earlier than the server's system date or the date entered in the Connection screen. |
o prevent the warning from displaying, change the ENDDAT parameter on the folder(s) where this warning is occurring. |