Hello,
I need to add an overhead cost on raw material used in a work order.
We use the AVC valuation method with a calculated cost.
Simple example: I need to add an overhead of 0.05$ per gram, based on the total Raw Mat 1 quantity ALLOCATED in my work order.
I've played with the Overhead code parameters but can get it to calculted it soully on the Raw Mat 1 item. The system applies the overhead on material, machine and labor.
Can anybody coach me on this one please?
Thanks a million!